Tromak Energy || Power Plant || Used Power Plant for Sale || Used Gas Turbine || Gas Engine || Steam Turbine
  • HomePage
  • About Us
  • Products
    • HFO Fired Power Plant >
      • 2 X 12 MW HFO Engine
    • Gas Turbine Power Plant >
      • 400 MW GE 9FA Combined Cycle Power Plant
      • 44 MW WARTSILA POWER PLANT - NEW
      • 125 MW GE LM6000 PC Power Plant
      • 12 MW X 3 MAN GAS TURBINE GENERATOR
      • 48 MW Power Barge Power Plant
      • 60 MW LM6000 PC Sprint Power Plant
      • 4,2 MW SGT 100 Gas Turbine For Sale
      • Used Power Plant GE
      • 49.8 MW LM6000 PC Power Plant
      • Power Plants
    • Gas Engines Generators >
      • 55 MW 50 MW 60 MW Wartsila Simple Cycle
      • 2.2 MW DEUTZ GAS ENGINE
      • 4280 KVA Wartsila Gas Engine
      • 70.8 MW Gas Engines For Sale
    • Biomass Power Plant >
      • Biomass Power Plant for Sale
    • Steam Turbines
    • Used Power Plant for Sale
    • Power Plant for Sale
    • BIODIESEL GLYCERIN FEEDSTUFF PLANT
  • Contact

2 x TBG 632 V 16 DEUTZ (MWM) ENGINES



2x3.916 MW  (2 x TBG 632 V 16 DEUTZ (MWM) ENGINES)

Engines (x2) - DEUTZ AG (MWM) TBG 632 /TCG 2032 V 16 3.916 kWe / Model Year = 2003
The plant consists of two DEUTZ (MWM) engines, model TBG 632 V 16 operating by natural gas. Before the connection to the gas regulator group of each motor, the natural gas passes through a newly installed Measurement and Regulation System that filters and reduces the pressure to adapt it to the motor requirements. 
Each engine operates a generator of 4.850 kVA electrical output. The current of each generator is sent to apart 11 kV set-up transformer. Current situation of the engines : The installation has running time of the engines of 46.300 h and 45.300 h hours respectively.

Thermal Utilization
 Steam generation
The exhaust gas from engines were directed to heat recovery steam generators (boilers) that produce 3 t/h saturated steam at 7,5 bar using the heat produced by the exhaust gas. Steam Production from exhaust gases at 7,5 bar 3 t/h per engine. 

Boilers (x2)
Capacity = 1.739 kW/h,
Operation pressure = 7,5 bar
Project pressure = 10 bar
Model Year = 2004


For detail information gas engine please contact with us.
Powered by Create your own unique website with customizable templates.
  • HomePage
  • About Us
  • Products
    • HFO Fired Power Plant >
      • 2 X 12 MW HFO Engine
    • Gas Turbine Power Plant >
      • 400 MW GE 9FA Combined Cycle Power Plant
      • 44 MW WARTSILA POWER PLANT - NEW
      • 125 MW GE LM6000 PC Power Plant
      • 12 MW X 3 MAN GAS TURBINE GENERATOR
      • 48 MW Power Barge Power Plant
      • 60 MW LM6000 PC Sprint Power Plant
      • 4,2 MW SGT 100 Gas Turbine For Sale
      • Used Power Plant GE
      • 49.8 MW LM6000 PC Power Plant
      • Power Plants
    • Gas Engines Generators >
      • 55 MW 50 MW 60 MW Wartsila Simple Cycle
      • 2.2 MW DEUTZ GAS ENGINE
      • 4280 KVA Wartsila Gas Engine
      • 70.8 MW Gas Engines For Sale
    • Biomass Power Plant >
      • Biomass Power Plant for Sale
    • Steam Turbines
    • Used Power Plant for Sale
    • Power Plant for Sale
    • BIODIESEL GLYCERIN FEEDSTUFF PLANT
  • Contact