Tromak Energy || Power Plant || Used Power Plant for Sale || Used Gas Turbine || Gas Engine || Steam Turbine
  • HomePage
  • About Us
  • Products
    • HFO Fired Power Plant >
      • 2 X 12 MW HFO Engine
    • Gas Turbine Power Plant >
      • 400 MW GE 9FA Combined Cycle Power Plant
      • 44 MW WARTSILA POWER PLANT - NEW
      • 125 MW GE LM6000 PC Power Plant
      • 12 MW X 3 MAN GAS TURBINE GENERATOR
      • 48 MW Power Barge Power Plant
      • 60 MW LM6000 PC Sprint Power Plant
      • 4,2 MW SGT 100 Gas Turbine For Sale
      • Used Power Plant GE
      • 49.8 MW LM6000 PC Power Plant
      • Power Plants
    • Gas Engines Generators >
      • 55 MW 50 MW 60 MW Wartsila Simple Cycle
      • 2.2 MW DEUTZ GAS ENGINE
      • 4280 KVA Wartsila Gas Engine
      • 70.8 MW Gas Engines For Sale
    • Biomass Power Plant >
      • Biomass Power Plant for Sale
    • Steam Turbines
    • Used Power Plant for Sale
    • Power Plant for Sale
    • BIODIESEL GLYCERIN FEEDSTUFF PLANT
  • Contact

5 x TBG 632 V16 DEUTZ + 1 x TCG 2032 V16 MWM 



5 x TBG 632 V 16 DEUTZ + 1 x TCG 2032 V16 MWM

DESCRIPTION OF THE INSTALLATION 
The plant consists of five DEUTZ (MWM) engines, model TBG 632 V 16; one MWM engine model 
TCG 2032; one Caterpillar engine model G 3520 B operating by natural gas. 

3 x 3,916 MWe engines;
Each engine operates a generator of 4.850 kVA electrical output. The current of each generator is sent to apart 11 kV set-up transformer. Current situation of the engines : The installation has running time of the engines of 50.900, 51.750, 49.600 hours respectively. 

2 x 3,544 MWe engines;
Each engine operates a generator of 4.700, 4.600 kVA electrical output. The current of each generator is sent to apart 6,6 kV set-up transformer. Current situation of the engines : The installation has running time of the engines of 21.400, 22.200 hours respectively. 

1x 4,000 MWe engine;
Each engine operates a generator of 5.055 kVA electrical output. The current of generator is sent to apart 6,6 kV set-up transformer. Current situation of the engine : The installation has running time of the engine of 15.800 hours respectively. 



​
For detail information gas engines contact with us.






Powered by Create your own unique website with customizable templates.
  • HomePage
  • About Us
  • Products
    • HFO Fired Power Plant >
      • 2 X 12 MW HFO Engine
    • Gas Turbine Power Plant >
      • 400 MW GE 9FA Combined Cycle Power Plant
      • 44 MW WARTSILA POWER PLANT - NEW
      • 125 MW GE LM6000 PC Power Plant
      • 12 MW X 3 MAN GAS TURBINE GENERATOR
      • 48 MW Power Barge Power Plant
      • 60 MW LM6000 PC Sprint Power Plant
      • 4,2 MW SGT 100 Gas Turbine For Sale
      • Used Power Plant GE
      • 49.8 MW LM6000 PC Power Plant
      • Power Plants
    • Gas Engines Generators >
      • 55 MW 50 MW 60 MW Wartsila Simple Cycle
      • 2.2 MW DEUTZ GAS ENGINE
      • 4280 KVA Wartsila Gas Engine
      • 70.8 MW Gas Engines For Sale
    • Biomass Power Plant >
      • Biomass Power Plant for Sale
    • Steam Turbines
    • Used Power Plant for Sale
    • Power Plant for Sale
    • BIODIESEL GLYCERIN FEEDSTUFF PLANT
  • Contact